Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. CAJUNINSPECT

    Transfer heat numbers

    These answers are certainly correct nI can tell from the content that there is lots of experience behind the previous answers. We are a pipe fabrication shop and holders of the following Stamps. ASME S Stamp, ASME U Stamp, as well a NBIC R Stamp. Like us, most folks have it stated some way in...
  2. CAJUNINSPECT

    PE Stamping Requirement for Piping Documents

    Some API and DOT regulations or standards require the hydro test charts from the chart recorders to be stamped. When performing an Alteration per NBIC I think the Calculations have to be provided by a PE as well.
Back
Top