Hello,
I am modeling a tunnel structure in sap2000 composed by a top slab, diaphragm walls, mezzanine slab, bottom slab and linings. Due to the presence of the linings there is a 80cm space between the slabs and the diaphragm walls which are connected during the temporary stage with shear boxes...