Greetings,
I am dealing with a system going AG and UG, can I active the seismic load at the AG line only and then deactivate it at the UG?
please advise
thank you
hi,
I just want to know, Do I need to subject the vessel connected to the pipe for seismic analysis OR just the pipe only?
for seismic study I think you need to subject it to the whole system (pipe & equipment) as long as it is above ground.
Also, Do I have to evaluate the nozzle loads of...