Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. EugeneNinnie

    Conversion of Snow load to SURCHARGE LOAD on Soldier H Pile Retaining wall with Lagging

    I should re-phrase my question....How do you convert the snow load into surcharge at the top of the wall??? and yes we have had an avalanche "expert" to provide all data. I need to convert this applied snow load to an equivalent soil height ABOVE the already 11 ft of soil we have to retain.
  2. EugeneNinnie

    Conversion of Snow load to SURCHARGE LOAD on Soldier H Pile Retaining wall with Lagging

    We are designing a Soldier H Pile Retaining wall with Lagging to support 11 ft height of soil at its greatest to 2' at each of the ends of this 61 ft long wall. The wall also needs to have another 10 ft of extended H pile with steel lagging for avalanche control along its entire length. The...
  3. EugeneNinnie

    Clean Outs on Force Main - Enclosed in Manholes vs. Cleanouts brought to Ground Surface

    We are examining a force main in a municipality that is approx 2500' long with cleanouts inside of manholes. The problem is that the manholes are not sealed and are in a high water table area where water is in the manhole 365/24/7...........I say eliminate the manholes and re-construct the...
Back
Top