  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. azer mashhood

    PWHT on corrosion resistant alloy piping

    great feedback. Thanks
  2. azer mashhood

    PWHT on corrosion resistant alloy piping

    Thanks Steve. Since the heat treatment required for Code reasons and not Process reasons, I concluded that no-contact scenario with service may not be a good reason to waive PWHT. Therefore as you said, it can be relaxed if the code allows provide relaxation for this material group. Thanks for...
  3. azer mashhood

    PWHT on corrosion resistant alloy piping

    Part of it is topside piping to B31.3 and other part is pipeline to B31.4 and 31.8
  4. azer mashhood

    PWHT on corrosion resistant alloy piping

    Hi, Appreciate if somebody can provide some guidance here. We have a carbon steel base pipe (more than 20mm thick) with Alloy 626 clad. Sour service at fairly high pressure offshore application. Does the base metal require PWHT? If the base metal hardness is maintained with pre heating and...