I have a situation where I have requirement of 24" x 8" weldolet (Sch 80 x Sch 80), where as I have received offer from vendor with different schedule i.e sch STD x Sch 80.
can I accept lesser schedule weldolet on run pipe schedule?
kindly advise as my branch pipe sch requirement are met.