  1. Tridiartha

    parameter a2 of Figure UW-13.2 Sketch (r) and (s)

    Hi Mike, Thank you for the advice. I have made a sketch to refine my question. Please refer to the attached sketch. Is it correct to intrepret that point A (on that sketch) was the starting point of construction line? Regards...
  2. Tridiartha

    parameter a2 of Figure UW-13.2 Sketch (r) and (s)

    Hello, I would like to seek advices regarding the physical intrepretation of variable a2, as shown in ASME VIII Div 1, Figure UW-13.2 Sketch (r) and (s). In those sketches, variable a2 is related with a construction line (with minimum 45 degree angle). What is the purpose of this construction...