what the criteria are from the Mechanical Engineering point of view about to partial replacement or partial repairment or total replacement of the pipeline based on the results to be obtained from the LRUT or intelligent pig inspections . Is there
something like this in International standards...
Dears,
I am looking for some guidance on modifying a vessel (3 phase seperator) to add a new level bridle.
My question is, does the design and material for the bridle/standpipe follow asmeb31. 3 or the design code for the vessel (asme VIII Division 1)??