Thanks a lot I think we're should make it unbonded in this case what is the required joints and can we pour that whole area at once or we need to make joints during pouring
We are casting a concrete screed of 100 MM over raft what is the required joints for this slab and what is the pouring procedure and I need reference for this topic from aci