  1. MEG1122

    Pole mounted distribution transformer neutral connection

    We have a pole mounted distribution transformer, and I am trying to figure if the X0 should be connected directly to ground rod or should be connected to power panel neutral? One of the arguments made by line crew is that neutral wire should run to main breaker to get good reading between phase...
  2. MEG1122

    Equipment BIL rating and flashovers

    Recloser:38kV, 150kV BIL recloser. Arrester:30kV, 24.4 MCOV Substation transformer is solidly grounded.
  3. MEG1122

    Equipment BIL rating and flashovers

    Hello….. we have 34.5kV distribution lines where we have experienced multiple flashovers on the pole mounted reclosers in past few years. During all failures, we either had damaged interrupters or bottom part exploded. About 70% of the failures happened during Dust storm and raining weather...
  4. MEG1122

    Outage on distribution circuits due to high humidity

    What I am bit confused on how would line to ground flashover cause overcurrent on phase conductors resulting in blown fuses and in some cases blow surge arresters?
  5. MEG1122

    Outage on distribution circuits due to high humidity

    We recently had few distribution circuits tripped due to very humid weather conditions. Our initial thoughts were air pollutant combined with high humidity, reduced the creepage distance on the insulators which led to line to ground flashovers. However, we found few blown fuses along these lines...
  6. MEG1122

    Short circuit forces/loads on powerline structures

    Hello everyone.... Can someone tell me why powerline structures are not designed for the forces due to short circuit currents whereas substation buses design take these forces into account? I have seen some substation gantry designs taking into account the wire loads due to short circuit...
  7. MEG1122

    Non Technical Question

    I am wondering if any one went from engineering to research and then transitioned back to engineering? Did you have any issues in getting back into engineering. I currently work for an engineering firm and have around 10 years of experience in my area. I have an opportunity to work for one of...
  8. MEG1122

    Transmission line insulation selection

    Hello everyone What governs the design of transmission line insulation? Switching surge overvoltage or lightning impulse.