Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: J.Key
  • Order by date
  1. J.Key

    Omicron overcurrent protection testing

    Hello, could someone help me with Omicron tool for overcurrent protection testing? As far as I understand if I have protection relay with START contact I can set the settings and omicron tool will automatically draw the trip curve, correct? Could you share some template file so I can take a look...
  2. J.Key

    MV Non-SF6 Switchgear

    If you are interested in 6,6kv and 11kV ABB AIS SWBD info let me know. Have been working with it for 8years.
  3. J.Key

    Directional Earth Fault / ring operation - 11kV Vessel / isolated ground network

    Hello RRaghunath, the SIEMENS SWBD was added quickly without our approval or questions, so they just did single bus, if we were consulted we would tell them that ring operation is prohibited (as we have the similar system for ships ring-net system (split ring, short time parallel function). The...
  4. J.Key

    Directional Earth Fault / ring operation - 11kV Vessel / isolated ground network

    Hi, as far as I know, EF should be used at the beginning of the protected cable on the side of the power source. That is a reason we have DEF there. Both upstream CBs trip at the same time for DEF2low, if we supply only with one CBs everything is OK, The issue is when we feed with 2 of them.
  5. J.Key

    Parallel Generators - with and without Unit Transformers

    Hi, you need to provide more information. What protection relay indicate? Differential trip? Overcurrent trip? do you have single line diagram?
  6. J.Key

    Directional Earth Fault / ring operation - 11kV Vessel / isolated ground network

    Hello, all, I have a question/topic to discuss. We are currently building a ship with 11kV distribution. We have one DG running with neutral point resistor. The generator is feeding the main busbar where we have 2 feeders with MV circuit breakers. Both of the feeders are then connected to a...

Part and Inventory Search