Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. tt90lrb

    Power System Description

    I'm working with a European company providing some control equipment for an off shore drilling unit. According to the specifications, the available power feed to our control system is 690V Delta "RI". I am having trouble with the "RI" definition ... basically I can't find a description for...
  2. tt90lrb

    Instrument Grounding Scheme

    Talked to one of the more senior engineers. The intent is to block DC and low-frequency currents by connecting blocking devices (such as a cap or zener diode) between the cable sheilding and the PE ground. This would allow current flow in the sheild wire as well to prevent ground loops. I'm...
  3. tt90lrb

    Instrument Grounding Scheme

    No, sheilds are not connected at the field end. It doesn't seem like a solid path to ground on the control panel end (all passing through a ceramic cap). Would this arrangement provide any noise suppression (I guess I'm not sold on the arrangement)? Main concern is the serial...
  4. tt90lrb

    Instrument Grounding Scheme

    I recently ran into a client grounding scheme that I'm not too familiar with. I could use some insight from the group. For instrumentation (pressure transmitters, for example) and communication (serial coms), they connect the sheilds to a cabinet ground buss labled "IE" which I'm assuming is...
  5. tt90lrb

    Ferroresonate Transformer Application

    At first glance, the waveforms don't look that bad. You have to realize that I'm working this through e-mail (remote off-shore site) and the data doesn't have a real high resolution. Funny thing ... different rig with a slightly different application. Same ferro xfmer but feeding an on-line...
  6. tt90lrb

    Ferroresonate Transformer Application

    I believe busbar has described the original problem correctly. Most of the RMS-AC readings didn’t show any problems. However, the on site personnel was reporting a frequency jump in the 150+ range when load was increasing and the UPS unit switched to battery power. I do believe it was a...
  7. tt90lrb

    Ferroresonate Transformer Application

    Thanks jbartos - I'm really not looking for product info on ferroresonant voltage regulator transformers, but the problems involved in having two in series (feeding one from the other). It's my understanding that this type of xfmer produces a non-liner current waveform. When load increases...
  8. tt90lrb

    Ferroresonate Transformer Application

    Looking for some technical insight or a pointer to better understand a problem recently. A customer has a UPS (on off-line ferroresonate type) providing backup power for a control system. Because of power quality issues at another customer site, they have installed a power conditioning...
  9. tt90lrb

    Motor Heat Load Dissipation

    Looking for a formula to calculate motor heat load dissipation. I have a 100hp TEFC motor (460V 3ph) on our shop floor running continuously under normal load. In sizing a ventalaion system for this area, I'm trying to account for the heat generated by the motor.
  10. tt90lrb

    Battery Charge Rates

    Follow up. Problem with our test procedure rather than our math. Compairing data from a full battery discharge with objectives based on normal load. Found a good info source in the Exide website. An equation listed for lead acid type batteries: Charge Amp = ((Battery Amp x Battery Hrs x...
  11. tt90lrb

    Battery Charge Rates

    No, I haven't. Took the info out of the user's manual and didn't confirm with a meter. The configuration of the batteries is 2 - 10 battery strings. That would divide the charging current by half, but the output would also be half from each string. I'll take a messurement next time to...
  12. tt90lrb

    Battery Charge Rates

    Which is what I would have expected. The actual re-charge took over 15 hours. Somehow I'm off by a factor of roughly two.
  13. tt90lrb

    Battery Charge Rates

    I'm trying to calculate the charging time required for a UPS battery bank. I have a 260 Amp/hr battery bank (120VDC - sealed lead acid type) connected to a 6 ohm, 2.5KW resistor bank for 2 hours. This test is used to simulate the maximum foreseeable load and to chart voltage and current of...
Back
Top