I have a class B 40' 2.25 treated piling driven 22' into the ground and cemented. The top of the piling is 12" diameter and the driven bottom is 7". The piling is 5 3/4" out of alignment and I would like to pull it into line using a come along and chain. The chain will be fixed to the top of the...
I have a situation with a class B 40' piling treated to 2.25 that has a 12" butt and 7" top that is driven in the ground 22' and cemented. The top of the piling is out about 5 1/2" out of alignment and I would like to pull on it to align with the structure. I have sister pilings that I can rig...