Background:
We operate a gas plant with a load of approximately 7 kW. Our power supply is provided by a substation, and we also have a backup generator connected to an Automatic Transfer Switch (ATS). This setup ensures that in the event of a power outage, the ATS switches to the generator. For...
If I am understanding your question correctly, you are taking about Pressure and temperature compensation, to compensate the difference in pressure and temperature at the time of calibration and site conditions. We are not using the Pressure and Temperature compensation in our meter.
Dear forum members,
Hope you guys are doing well.
I have a query. At our metering station, a 10" NG USM is installed for volume measurement. At the downstream of our metering station, approximately after 2 KM of 14" underground pipeline, another 8" NG USM is installed at receiving station...