Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Lcorrea

    Why Asme VIII div 2 in their load combinations table 5.2 do not combines E with Temp?

    Why Asme VIII div 2 in their load combinations defined in table 5.2 do not combines Earthqauke with Temperature loads. Some experts say if the temperature is present during earthquake, then E &T shall be in a combination. I sounds logic, but ASME code does not include it. Why?

Part and Inventory Search