  1. Saiedsadat

    Earth mat design Using ETAP software for Industrial substation (High Short current Fault)

    One more question. If there be more than a transformer in site should I consider any probability coefficient for LV side ground fault?
  2. Saiedsadat

    Earth mat design Using ETAP software for Industrial substation (High Short current Fault)

    Thanks you mean I've just consider Isc in MV side and then design Earth mat using Etap?
  3. Saiedsadat

    Earth mat design Using ETAP software for Industrial substation (High Short current Fault)

    Thanks for replies 0.217/Rground ? How do you calculate this 0.217/Rground? Any references? As I understand I should design earth mat for this value,Correct?
  4. Saiedsadat

    Earth mat design Using ETAP software for Industrial substation (High Short current Fault)

    Dear all, I have a 1.6MW,400V Gas Engine-Generator with Y Generator and i want to connect it to Y side of a Dyn5 (0.4/20KV) transformer to parallel with grid. in Etap when i earth both of generator and transformer solidly , 75KA phase to earth fault detects in downstream Bus. Fault...