Hi All,
Have a renovation where we are cutting into an existing masonry block foundation wall in order to install an egress window, have speced L channels (3 1/2'' x 3 1/2'' x 7/16'') for the header
was just wondering how to go about detailing a connection. Was thinking about grouting the...
Hello All,
Recently came across a project with some interesting features where a contractor had renovated and build a flat roof on one half of an existing pitched home. (see photo)
Each 2x6 rafter is now subjected to a point load of 720lbs spanning 13'
What kind of solutions would their be...
Hello All,
I have a question about hurricane clips in roof rafters (see attached photo)
Rafters are clipped to walls on each side (beside 2x6s see attached photo), however they are not clipped to the beam
Contractor has clipped to the bottom of the beam with 2x6s where the drywall will be...
Can the fact that this system is located within the walls of a home be considered laterally braced and therefore we can make the connection to the foundation pinned?
Hello All,
I have a quick question about column theory
If my steel column in attached photo is pinned to the beam connected on top and fixed to to the foundation on the bottom is that moment connection at the foundation taking any moment?
furthermore, if that connection to the foundation is...
Hi all,
have a few questions about collar ties and roof rafters in a vaulted ceiling. See attached photo for more information.
Q1) In this situation do the collar ties help support roof rafters and can this be considered a support allowing a span of 10'-6''?
Q2) Rafters should have been bird...
Hi all,
Quick question, I currently have a W8x18 steel ridge beam spanning 20'5'' suppporting a 0.98 kip/ft UDL (snow load) in a residential area with one support fixed going into an exterior wall below and the other support needing a column down to the ground floor. The total length of the...
Ron247 the 12'-11'' span has the joists running parallel therefore not picking up a UDL and instead picking up a point load from another beam at the end (1.68 kips).
Yes I have the new beam with DL on left only (0.9 factor) and a live/dead point load from bathroom (factored) only.
see attached
as you can see there is about 800lbs of uplift force on the beam in this worst case scenario.
little to no exposure to wind and does not govern, my worry is a full loading on the right span (where master bath is) and say little to no LL on left span causing a large uplift force on left support
Hello all, this is my first time posting here so apologies if this is formatted wrong.
I had a couple questions about a beam I am currently analyzing that has a large cantilever section and had a few questions
*UDL of 0.31 kip/ft is a snow load
*UDL of 0.35 kip/ft is a LL/DL
*Point load of...