Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Whin
  • Order by date
  1. Whin

    Tank Soil Settlement

    Is it necessary to perform a routine soil settlement survey for in-service tanks that are supported by concrete, or is this requirement applicable only to tanks that rest on an earthen foundation? Could someone provide a relevant reference standard for this requirement?
  2. Whin

    Heat Exchanger one stream out of service

    The BFW preheater exchanger, featuring MP steam on the shell side, will be permanently decommissioned, while the tube side BFW will remain operational. The design pressure for the shell side is 24 Barg, whereas the tube side is rated at 88 Barg. The design temperatures are 390°C for the shell...

Part and Inventory Search