Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. NicB5858

    Pad footing excavation and existing footing

    Some further context - the footing holes / works have been fully engineered - I am performing non structural demolition, and digging the required 2 footing holes - I have commenced the work I committed to doing before the builder commences - simply, digging a footing hole per the engineering...
  2. NicB5858

    Pad footing excavation and existing footing

    Hi, we’re soon to commence a renovation and I dug one of the two pad footing holes for structural steel (in preparation for Buidler to pour footing etc.), adjacent to an existing strip footing. The footing pour has been delayed (weeks) - is there any risk of undermining the existing strip...
  3. NicB5858

    Brick veneer zig-zag cracking in mortar

    Looking for any advice / thoughts on this previously patched zig-zag cracking in the mortar? House built in approx 1962, and it’s the only occurrence of this on the whole property. Thanks

Part and Inventory Search