Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. C. Hirata

    is it acceptable to join two beams for material lenght usage?

    yes, I thought it was an odd comment from the checker, since I hadn't hear against this practice, I have to say I'm not even in the US, but as far as I know if the process is on paper and qualified, and the welding itself pass through any applicable test, beam continuity is ensured, visually is...
  2. C. Hirata

    is it acceptable to join two beams for material lenght usage?

    I understand it is posible to join two HSS beams, using a butt welded joint or maybe another prequalified welded procedure, but there is a code against it? I mean in the AISC or local code you may know, where it could say that "under X condition you should not join two beams"
  3. C. Hirata

    is it acceptable to join two beams for material lenght usage?

    Hello, first time here, we have this project and a supervisor told our people that a beam, HSS 14X6X1/2, should be continuous, without any welded tie, this would result in large material waste, and as far as I know, there is no code that avoid this welded tie, but I'm dubious, is there any code...

Part and Inventory Search