Greetings,
I am the construction manager on a 4 story cmu facility being built on a beach in Florida. Not quite a geotech, but I am a civil pe. The facility was designed with a shallow continuous strip footing about 1'4" below grade. The width of the footing is between 3 and 5 foot (ranging in...