Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. Pawel Malota

    Gas Extinguishing System vs. power supply cut-off

    Aadil, I have the same meaning. HVAC is out, dampers closed. It was a discuss with some US technical staff that claims that in their opinion total power should be switched-off by FACP. Our Host Nation codes and also EN norms don't require it as well. Regards, Paweł Małota ELV Systems Designer...
  2. Pawel Malota

    Gas Extinguishing System vs. power supply cut-off

    Hallo, is any codes/regulation that requires to automaticly switch-off the power by Control Panel (FACP) in the room protected by automatic gas suppression system? Thanks in advance!! Pawel
Back
Top