Hi.
Consider a cable-stayed bridge. The side span consists of 18 segments and the midspan has (16 segments + Stitch segment + 16 segments)
The adopted construction sequence is the following:
From the Pylon, 16 segments are cast on both LHS & RHS sides, completely supported on Formwork.
Then the...
Hi.
Please consider a typical I girder superstructure.
Common practice in the industry is to use a Grillage model for analysis and design.
In longitudinal direction, we model the effect of deck slab in the form of effective width of each girder (Girder modeled as beam element) to account for the...
Hi
Please consider a soil strata:
Layer 1: Non liquefied soil : 0m to 6m
Layer 2: Liquefied soil : 6m to 10m
Layer 3: Non Liquefied soil : beyond 10m
When you analyze a Pile foundation (4-Pile system) for the Seismic case using Soil-Spring approach, Can you take into account the lateral...