Thanks for all your comments, very appreciated.
The things is this.
For the design of drilled piers to be done near the coast line.
We made a boring hole down to 25m.
THe soils that came out in the SPT samples, after lab analysis was 80% sand 20% fine soil, in which at least half the depth...