Situation: 15"PVC line with peak flow estimated at 4500gpm, contractor proposes using 45degree PVC bends to bypass MH they are replacing. They plan to set up a standard "pump around" bypass for 24hrs to allow high early strength concrete to cure. Replace MH, vacuum test, and coat; then reset...