Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. _Luke-Eng

    Wall to footing detail.

    Thank you. Just one more question. Why isolation joints are required for columns around slab. Why can't we do the right one for column as well?
  2. _Luke-Eng

    Wall to footing detail.

    Just strip footings. Walls can be either concrete or CMU Can you please brief me about how to design this haunch? In fact, I don't know why haunch is required here, what if it is just a sudden change in slab depth as shown below? As you mentioned it will behave like a continuous slab. So...
  3. _Luke-Eng

    Wall to footing detail.

    Thank you for your response. I have seen the LHS one a lot more. The RHS is really rare for me. I thought it was because to the LHS one can separates walls from slabs and thus avoid heavy line load being applied to the slabs, causing different settlements in slab and maybe avoid cracking (I am...
  4. _Luke-Eng

    Wall to footing detail.

    Hi fellows. I have seen the left one being used most of time. I want to know if or when I can use the right hand side one and why? Thank you.

Part and Inventory Search