Thank you for the replies. So basically anchor block are a waste of money.
I have another question. Is it justified to roll the riser to a degree say 15 meaning the lower 45 bend is 15 degree to the left of upper 45 bend. Is it possible the anchor block was placed to protect the rolling?
Hi, I have a question about anchor flange. As far as I know every buried pipeline here ranging from 20km to 800m uses anchor flange as shown in the image. Is it necessary or redundant even if the accompanying above ground piping have expansion loop or does it protect the riser? Sorry if the...