Am working on MV Scheme which involves 10 3750MVA 11kV DG sets. The sets will operate with Utility when mains return fora 15sec period.
FOR limiting generator earth fault currents am lookinag at two options
Option 1
Each Generator has its own NER +NEC controlled by GEN Controller
Option 1
A...