I have a group B building undergoing a Level 3 Alteration and Partial Change of Use, so essentially needs to be brought up to the code of a new building. 1st floor is about 5800 sqft all group B occupancy (tattoo parlor) 2nd floor is about 400 sqft all low hazard storage. No sprinkler system in...