Just wondering if anyone has run across a review agency that mandates the use of different peak/shape factors between the pre and post development analysis?
It is being mandated to use 200 in the pre and 400 in the post.
In coastal GA and SC either 323 or 484 have traditionally been used for...
Hi all!
The local water/sewer provider in our area is requiring that we use their details which are being provided in a PDF format with their title block, etc... These details are not to be revised, are to be shown on our plans as provided, and are not stamped/sealed by a PE from the...