Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. Tianll

    Qualified subcontractor of geotechnical investigation and topographical survey in Iraq

    Hello, everyone We have an EPC project for oilfield development in Iraq, and want to find the local qualified subcontractors to execute the geotechnical investigation and topographical survey, as well as underground pipeline detection, 3D scanning and modeling, besides the UAV inspection for...
  2. Tianll

    Schmertmann Method using CPT vs Using Modulus of Elasticity

    The methods of subsoil settlement calculation are always different resulting from different error of theoretical parameters, obtained both from site drilling and laboratory tests, as no two leaves are the same in the world![bigsmile]
Back
Top