they walked in the fresh concrete, used gradall bucked to load from truck then lifted to 2nd floor transferred to wheel barrow then dumped down the stairs
Is it okay to place concrete in metal pan stairs by letting it flow from the top landing all the way to the bottom (20 steps) filling each step as it flows down