Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. DM_IRL

    Integrity testing of precast driven piles with steel moment connection joints

    Hi, I have a project where precast piles have been extended with joints in order to achieve required driven length. Sonic Echo Method is being used to verify integrity but the signal cannot pass the joints so the integrity of the section below the joint can't be verified. Is there an...

Part and Inventory Search