Looped line is essentially what we would be looking at doing. There are two streams that deposit into this drop box. We are looking at no longer having one of them deposit into the drop box and instead extending the line downstream to 0.9 mile and then having it tied back into the main line...
Hi pipe gurus,
Hydraulics is not my area of work but I have a problem my company has been experiencing.
We deposit multiple slurry streams into a drop box where it then travels by gravity for 4 miles.
We find that the drop box is overflowing quite often.
Along the line there are three...