Hi,
I'm working on a support of excavation design for a 35' cut.
The design shows a 16" dia (10ft sections w/threaded joints) minipile "MP" with 10' bond length. They are considering inserting a 12" x 0.5" steel pipe (full length) inside the 16" dia MP as reinforcement and also to resist uplift...