I am attaching a drawing I made I have a timber post 5" x 6 7/8". I am trying to determine the depth into a circular steel sheeting that will be filled up with concrete to act as our pile. I have found the moments acting in the x (3520 ft-lbs) and z axis (3520 ft-lbs) and from there calculated...