Hello,
I'm a Controls Engineering that has been handed some high power Electrical Engineering work so I'm a bit out of my depth on how to move forward with this.
We have 12 sets of 3 phase 750 MCM feeds running in parallel through a wall (5" conduits each), into a building. Our switchgears lie...