With the BMP Trains program in Florida, under the Retention Basin treatment option under "2. Enter Treatment" it asked for "Provided Retention Depth (in over Catchment)". May someone elaborate on what it is asking for. I took it as the actual elevation difference between design pond bottom and...
DrZoidberWoop you seem to have the most similar experience as me. I actually worked with heavy civil contractor for 9 years, and got PE during that time, as I got BSCE in school. Then did PM role with university for a few years. Recently took a PM role with smaller civil firm. Yes, I was...
Has anyone else started in the construction industry, then transitioned to the design side. I would like to know what your experience was like and if you believe it was the right move? How long did they give you to "get up to speed"?