Hi,
We are civil engineers but have been pulled into what I think is a mechanical engineering issue.
A local bakery is adding a new building onto their complex. The mechanical engineer is specifying floor drains. The drains will exit the building into a 1000 gallon (sized by the ME) grease...
Hi everyone,
We're trying to help a client that had serious flooding of their building during a significant rain event last August in our area. There is a catch basin (CB) situated on the client's property. An 8 inch CMP exits from the CB and goes to a street drain manhole (DMH) about 150 ft...