Hi Everyone,
I am working on a 2-story parking garage excavation project located next to a ~60' slope. As you can see in my crude drawing, the slope has been covered with wire mesh and an ~4" layer of shotcrete. The toe of this slope is set back 3' from the excavation.
The Structural engineer...