Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: TFig
  • Order by date
  1. TFig

    Verification of “R” type radii callouts

    To clarify, the R callout is typically deployed by our engineers at the end of what might be a milled slot. Say a .500+/-.005 slot with R at the end. Before I retired we required our suppliers to use the slot width to determine the appropriate radius (.250 in this example) and report actual. The...
  2. TFig

    Verification of “R” type radii callouts

    Our engineers often use the R symbol to designate a continuous smooth radius on a part. My problem comes from how this is to be interpreted during the First Article inspection? Do you just visually verify that there is a smooth continuous radius or do you actually measure and report an actual...

Part and Inventory Search