I have 3 LVL 1 3/4" x 11 7/8" x12' a 5/8" attached together, a hole was drilled from the top of the center LVL to the bottom for a hold down treaded bar, which was in the wrong place. This is about 12" from the wall that supports the beam. Can I fill in the hole with an epoxy, if so what type?