Hello Stephen,
thanks for reverting. more details as follows.
1. reducing tank height (from15mtrs to 12mtrs) and roof conversion(EFRVT to CRVT), both jobs to be executed on same tank.
2. 2 wind girder available which have to be replaced with a single wind girder at location specified by the...
Hello Everyone,
We require tank conversion methodology, so that same can be vetted and approved.
job 1 : reducing tank height from 15 mtrs to 12mtrs
job 2 : converting roof from external floating roof to cone roof.
Can anyone post the methodology/detailed procedure for the above mentioned...