I have to verify the safety of an old construction.
The construction is a tunnel above an L-Wall. The Tunnel is 4,5 above a 3 meter thick concrete slab of the L-wall.
The 4,5 meter of space is filled with soilcement (sand + cement).
I can't find any good value for the modulus of subgrade...