I have to specify the process data for the choke valve.
The well is having the following conditions
2000 BPD oil with 0% water cut
4000 BPD oil with 50% water cut
In this case, oil is flowing from 3 wells which is combined in a local manifold near the 3 wells and one line is run to the...
I have to specify the process data for the choke valve.
The well is having the following conditions
2000 BPD oil with 0% water cut
4000 BPD oil with 50% water cut
In this case, oil is flowing from 3 wells which is combined in a local manifold near the 3 wells and one line is run to the...
Fairclough
You are suggesting to avoid coriolis flowmeter when the water cut is high and gas/ oil is not separated
what is the water cut above which it is categorized as high
Once a separator is installed to separate the oil/water and gas the coriolis flowmeter should not be a problem.
in...
I have to perform the two phase pressure drop for the oil flowing from the wellhead to the inlet manifold at the station via the choke valve and manifold.
known data are flow rate, wellhead flowline presssure and temperature and water cut.
Seeking help to the do the above
I have to perform the two phase pressure drop for the oil flowing from the wellhead to the inlet manifold at the station via the choke valve and manifold.
known data are flow rate, wellhead flowline presssure and temperature and water cut.
Seeking help to the do the above