Sorry guys, the question is confusing indeed. However, what i am doing now is: first to check the stability of the cutting before implementing the river bank protection.
There is a slight change in the design now. The existing river bank will be cut back 2m from the crest and the slope angle is...
Hi there,
I'm currently involving in a river bank (slope stabilization). The proposed river is to be widen by cutting back the river bank 1.5 m back and 1 m depth from the ground level. The angle of the slope is 35 degree. The scheme is to increase the capacity of the river to prevent flooding...