Help. We are adding a two story addition, with a walk out basement apartment. The foundation is near a 38 foot dug well.We have tarred the blocks, put in perforated pipe covered with stone.The outside wall is still exposed. I see a wet spot, four foot square, on the inside block, around 4 to 6...
A slab will be poured soon in the basement of our two story addition. We have 2" foam insulation under and at edges,and vapor barrier. Then a steel grid is laid to which the radiant heat pipe is attached. We want a nice smooth finish. Any suggestions and/ or cautions. The structure is...