  1. hmzM

    API 1104 - welder position

    Hi, refer to the API 1104 - Clause 6 Qualification of Welders. 1. If a welder passed 5G qualification, what is the tolerance (degree) for the horizontal production welding? 2. What is 6G (tolerance of degree) during the production welding? I noticed that no further details in the API1104...
  2. hmzM

    Golden Joints

    Refer to the pipeline design ASME B31.4 and welding in accordance with API 1104. 1. There is any clause mentioned the limitation of the golden joints (final tie-ins without hydrotest)i.e. quantity of the golden joints are permitted? 2. It's possible to put a extra pipe (e.g. 2m pup-piece)...
  3. hmzM

    Hydrotest for Tank

    Dear Sir, 2 nos. of 100mm X 100mm plates have been welded to the bottom plate (after rhe hydrotest) and steel rods from the anode bed will be attached (welded) to the plate. Prior to the installation of the steel rods, vacuum test of the 100mm X 100mm plate shall be carried-out.
  4. hmzM

    Welding Fitting to Fitting

    Dear All, just want to know, to weld between fitting and fitting with the same thickness, did we required to weld for the whole thickness or just half of the thickness. This is for ASME B31.3. The actual configuration as below:- pipe (25mm thk.) - tee (50mm) - tee (50mm) - flange (40mm) pipe to...
  5. hmzM

    Welding after Hydrotest for Tank

    Dear All, I have one problem. A tank has been hydrotested but unfortunately the contractor miss to install (welding)anode bed inside the tank (in the drawing, not mentioned about anode bed but mentioned in the contract requirement). Did the contractor still need to carry out the hydrotest or...
  6. hmzM

    Crack between flange and elbow

    A weld (ASME IX) between flange and elbow (36", heavy wall) found crack during the RT and has been cut-out and re-weld, but unfortunatelly the second RT result shown that a new crack. Did any clause in the ASME IX or B31.4 or else, mentioned that all cracks shall be cut-out and re-weld? What...
  7. hmzM

    Hydrotest for Tank

    Dear All, I have one problem. A tank has been hydrotested but unfortunately the contractor miss to install (welding)anode bed inside the tank (in the drawing, not mentioned about anode bed but mentioned in the contract requirement). Did the contractor still need to carry out the hydrotest or...
  8. hmzM

    WQT for ASME IX

    Hi, A welder already qualified with API 1104 (pipeline welding), did the welder shall perform WQT for ASME IX (station piping) in the same project, if all the essential veriables are the same? If I want to ask the welder to perform new WQT according to ASME IX, what clause should i say?
  9. hmzM

    Welding of API X-70 pipe

    Welding using API 1104. For the selection of wire for welding of X-70 pipe, could we use E6010 for root & E71T8-K6 or E 71T8-Ni1 for fill & capping? According to data sheet provided by manufacture of the wire, the wire tensile and yield strength is lower than steel grade X-70.
  10. hmzM

    API 1104 X-65 to X-70

    1. If WPS for X-70 11.71mm has been qualified and WPS for X-65 18.91mm also has been qualified. Did need another WPS to be qualified to tie-in between the X-70 and the X-65 pipe? or we can use the qualified PQR for X-70 pipe? 2. If WPS for X-65 12.61mm has been qualified and WPS for X-65...
  11. hmzM

    Pipeline Station Welding

    For my current onshore pipeline project, our Consultant allowed us to carry out welding activities for the station / block valves station using either API 1104 or ASME IX code. My question, it is possible for me to request the Consultant to use WPS based on ASME IX and the interpretation...
  12. hmzM

    Hi, Refer to API 1104, 6 Qualifi

    Hi, Refer to API 1104, 6 Qualification of Welders, 6.2 SINGLE QUALIFICATION 6.2.2 Scope c. A change of filler-metal classification from Group 1 or 2 to Group 3 or from Group 3 to Group 1 or 2 (see Table 1) So, if a welder carried out a test using Group 1 filler, did he qualified for Group 2...
  13. hmzM

    Qualification of welders (API 1104)

    Hi, Refer to API 1104, 6 Qualification of Welders, 6.2 SINGLE QUALIFICATION 6.2.2 Scope c. A change of filler-metal classification from Group 1 or 2 to Group 3 or from Group 3 to Group 1 or 2 (see Table 1) So, if a welder carried out a test using Group 1 filler, did he qualified for Group 2...