  1. Bahrin

    PHOSPHATE/CHEMICAL ADDITION IN BFW

    The outlet of the dosing pump must be conected via a non-return valve to the inlet of the boiler feed water pumps. This non return valve is in the standard delivery of the dosing unit. It is very good to start the dosing pump at the start of one of the boiler feed water pumps (it is possible...