We are installing 4 inch schedule 40 PVC in an electrical substation at a depth of 30 inches below grade. The purpose of the pipe is to serve as a conduit for electrical relay cables. There will be some heavy traffic driveing over the conduit on a regular basis. I need an equation that will...